I’m wiring service entrance for a accessory shed myself. The inspector is a great guy, I’m just hoping to avoid a fail, hahahaha. I purchased a meter base/service panel combo which feeds the service panel which is inside of the shed.
-I realize the service panel which is inside is considered a subpanel.
-the bonding screw has been removed from the sub panel..
Question--
The grounding bar in main panel will have 3 connections, correct?
1.Factory installed wire connecting the neutral in the meter base to the ground bar.
2. Copper ground wire going to the grounding rods in the ground.
3. Copper wire connecting the subpanels ground.
??
-I realize the service panel which is inside is considered a subpanel.
-the bonding screw has been removed from the sub panel..
Question--
The grounding bar in main panel will have 3 connections, correct?
1.Factory installed wire connecting the neutral in the meter base to the ground bar.
2. Copper ground wire going to the grounding rods in the ground.
3. Copper wire connecting the subpanels ground.
??
