I moved to the basement today, Its part of the generator install project that I really want off my plate.
First I had to install a water spigot on the front of the house.

I also ran two cctv cables while I had the siding off, and put a 1/2" spacer behind the siding to mount the spigot to. I'm going to have the foundation stuccoed after the east wall is finished.

I tee tapped the main line.

I had to pull several wires out of the panel and reroute them, they were pulled across the floor joists not between them.

I still need to move some data cables, the 12"x 12" box on the left is my internet, it comes down the old electric weatherhead and loose cables run everywhere from it, they need to be routed above the floor joists. The 2" coming out the bottom goes to the shop it has about a dozen cat 5e, cable tv, and cctv cables, and a pull rope just in case they invent something new.

We painted part of the basement. This is the wall where the sink and cabinet will go.

The fridge will go to the right, the sink and cabinet in the middle and a stove on the left. That's the stove in the foreground.