Thank you for the feedback. I had the quote from Graber already, and just receiced the quote from DC, and they are within hundreds of Graber. Here are the specs:
30'x32'x10' pole building
4x6 poles, 8' o.c.
with plastic sleeve [protect rotting]
1 bag(s) of sacrete per pole
2x6 skirtboards, 2 rows
2x4 side nailers, 24" o.c.
2x4 roof purlins, 24" o.c.
Trusses 4' o.c., 7/12 pitch
12x32x7 room with 36'' stairs in attic truss
with 2x6 over truss floor then 5/8 osb for flooring
12" overhang with soffit & gutters, 2' overhang on front eave
Double 2x10 truss plates
Painted 29 ga. on roof with screws
Painted 29 ga. on sides with screws
4" concrete floor w/rewire and plastic [fill not included]
Thermal 3-HT RRE 4'x 8' 1/2" on roof
Thermal 3-HT RRE 4'x 8' 1/2" on sides
4 Vinyl Window, 3040 Double Hung w/grid
1 3068 Cannonbal, 9Lt 95 series door Wht
2 THERMOGUARD, 10x8 TG-II RP with Genie openers
carriage style doors w/arched glass
1 Cupola, 36"x36" with windows, weathervane
2 Vinyl Octagon Vent, 24"
If you had to choose one or the other, who would it be?
Do you think it is better to site prep before or after the building is built? I have a heavy clay soil, and the back end is 2' - 2.5' lower...Also, is it expensive? I'm pretty new to all of this. Your replies are appreciated...