e-tek
Well-known member
I've decided that this summer I would build a bridge crane in my shop. I want to stay ahead of age and as I already have a bad back and a lot of arthritis, I want to get it built now.
I gave OLDCarGuys set-up in mind (and for anyone who hasn't spent time in OCG's shops, I HIGHLY recommend you put aside 20 hours to do so!) -
I had already planned to remove the OH door openers and either go with nothing, or install jackshaft openers and some pallet-racks will have to replace the hanging-shelving system I have now.
So, other than the obvious - sourcing, designing, drilling and bolting it together, what else should I know? I want to be able to pull engines anywhere - without having to muscle the cherry picker around, move engines, ******'s and such across the shop, move equipment and more.
I also PM'd OCG of course, hoping to get whatever pearls he may care to share with me as well!
Thanks!
I gave OLDCarGuys set-up in mind (and for anyone who hasn't spent time in OCG's shops, I HIGHLY recommend you put aside 20 hours to do so!) -
I had already planned to remove the OH door openers and either go with nothing, or install jackshaft openers and some pallet-racks will have to replace the hanging-shelving system I have now.
So, other than the obvious - sourcing, designing, drilling and bolting it together, what else should I know? I want to be able to pull engines anywhere - without having to muscle the cherry picker around, move engines, ******'s and such across the shop, move equipment and more.
I also PM'd OCG of course, hoping to get whatever pearls he may care to share with me as well!
Thanks!

Definitely frees up floor space!