I am new to the forum - but I should have been here awhile ago, I just finished a garage build project, the contractor did the entire structure, foundation and floor. There are footings and a 4 ft foundation.
The floor is a 6" deep 30x40ft floor, no rebar, mesh or otherwise. I was told it was not required. I told him I will be putting a 10K 2 post hoist in the shop.
I was told that they used a power trowel to finish the floor.
I have serious concerns about the quality of the job and I am looking for extremely open opinions - am I over reacting? Is this something I should be concerned about? How can this be fixed?
The edges look unfinished, there are void/bug holes, and the surface appears to be uneven and chipping in a few spots pretty bad.
The contractor seems to be willing to talk, but does not seem to be taking me seriously. I want to find a reasonable solution that does not involve breaking up and replacing the entire slab (which seems insane).
Thanks in advance.
The floor is a 6" deep 30x40ft floor, no rebar, mesh or otherwise. I was told it was not required. I told him I will be putting a 10K 2 post hoist in the shop.
I was told that they used a power trowel to finish the floor.
I have serious concerns about the quality of the job and I am looking for extremely open opinions - am I over reacting? Is this something I should be concerned about? How can this be fixed?
The edges look unfinished, there are void/bug holes, and the surface appears to be uneven and chipping in a few spots pretty bad.
The contractor seems to be willing to talk, but does not seem to be taking me seriously. I want to find a reasonable solution that does not involve breaking up and replacing the entire slab (which seems insane).
Thanks in advance.