Been dreaming this project up for awhile now. It's a 42'X60' with 12' walls. I wanted the guy to start in the spring, but a house he was building kept him away till now. After the foundation was done, he started building with just one other guy(two to put the rafters up)and did this much in a week!
Hoe comin in for the frost wall....
Diggin....
Dug...
As you can see, I bought the lumber when there was snow on the ground hoping for a spring build....never happen'd
Had to dig a hole and get some more fill dirt....
It's going to have two overhead door's (12wX11'h and 9'wX 10'h)along with a 3' steel man door. I planned on in-floor heating and pouring a slab this year, but it's getting pretty late.
Hoe comin in for the frost wall....
Diggin....
Dug...
As you can see, I bought the lumber when there was snow on the ground hoping for a spring build....never happen'd
Had to dig a hole and get some more fill dirt....
It's going to have two overhead door's (12wX11'h and 9'wX 10'h)along with a 3' steel man door. I planned on in-floor heating and pouring a slab this year, but it's getting pretty late.

.....Oh well, it's still moving along and the roof tin should go up tomorrow.....and I'm located North of Edmonton,AB

....Here's a few more pics of the slow process.....