I have lots of plans

most of them obviously just come down to time and money. I would like to be able to weld inside the building without opening doors. So ventilation is definitely on my radar. Just not far enough along yet to come up with an approach for it yet and make a decision. The part I do know is that it is one of the reasons I want to leave the rafters open. It would be much easier to install duct work for it without a ceiling. So I'll keep you posted as I get to that stage.
My current approach is obviously finishing the walls. Then getting a permanent heater. Right now I'm using a portable kerosene heater. Then epoxy coat the floor. After that's done then I'm going to trim the bottom 1/4" of the walls to allow for expansion. Then baseboards and interior items.
Wow having said all that the end doesn't seem that near. Lol
It would have been ideal to just shim the bottom Slatwall pieces which would have prevented the trimming post install. However because I'm installing it solo setting them directly on the ground was the only manageable way I could find to do it. Those panels are heavy. So it created more work but allowed me to do it without needing help.
Sent from my iPhone using Tapatalk