I will try to get a better picture tomorrow while I'm down there. I did get two ground rods drove in and hooked up today for the shop panel. I have not removed the bonding strap in the shop panel yet. I thought I better get the neutral and ground bonded in the main panel before I unhooked that one.
Ok, I did some research and this is the meter panel I have. https://www.summit.com/store/products/61892 If anyone needs anymore info on it let me know and I will see what I can come up with.
Just did some digging for u and IT IS suitable as service equipment. Youre in luck.
Just bond the neutral and ground bars and u should be good to go!
http://products.geindustrial.com/In...her?REQUEST=SPECPAGE&PRODUCT_NUMBER=R038C010U
