chicane
Well-known member
I have a 6 week old concrete slab (4" thick, 3500 PSI, fiber and wire mesh reinforced). I recently dropped a pair of vice grips from about 7 feet up and chipped the crete. I was a little miffed and didn't think it should chip quite that easily. Am I being a little paranoid or is this something to be concerned about? What about an epoxy coating to protect the floor?
