Jayhawk_Aviator
Well-known member
- Joined
- Jun 2, 2015
- Messages
- 123
Have a new 220V 60 gallon compressor ready to mount to my newly epoxied shop floor. Are people:
1) Leaving on the shipping crate
2) Removing from crate and sitting on the floor.
3) Bolting to the floor
4) Attaching to some rubber pads?
5) Something else?
Thanks,
Scott
1) Leaving on the shipping crate
2) Removing from crate and sitting on the floor.
3) Bolting to the floor
4) Attaching to some rubber pads?
5) Something else?
Thanks,
Scott