Shop is finally started!

The builders finished the poles this week. I was there for a few days to have a look at the shop and to meet with various people on the house. One problem the shop crew found was that the pad wasn't exactly lined up with the barn behind it. It's probably my fault for laying out approximate lines and not insisting hard enough that the pad crew do their own measurements. But the shop crew managed to fit it on the pad. It's not lined up exactly with the barn. It's about 18" offset but parallel, at least as far as I can see by eye. It's not a big deal and the direction they moved it gives me that much more room from the cut bank (out of the pic to the left) to the building to turn vehicles into the bay doors on that side. Other than not looking good on satellite photos it'll be fine.
There was a crew at the house digging a trench for power from the pole to the shop. It's about 600' the way they went around the house. There will be a tombstone transformer about 100' from the shop and a meter on the shop. As part of the trenching they dug out the septic tank the new trench would be passing near so they'd know where the outlet pipe went. And they found that the outlet's got a hole rusted through and it's packed with ****. They cut out a section of pipe while I was there and it's packed through that section. They were going to try farther down and if they can, snake a camera into the leach field to check it. But it's probably bad. Which we had been expecting until the guy who pumped the tank told us it was good. Of course he meant the tank not the field.

The builders finished the poles this week. I was there for a few days to have a look at the shop and to meet with various people on the house. One problem the shop crew found was that the pad wasn't exactly lined up with the barn behind it. It's probably my fault for laying out approximate lines and not insisting hard enough that the pad crew do their own measurements. But the shop crew managed to fit it on the pad. It's not lined up exactly with the barn. It's about 18" offset but parallel, at least as far as I can see by eye. It's not a big deal and the direction they moved it gives me that much more room from the cut bank (out of the pic to the left) to the building to turn vehicles into the bay doors on that side. Other than not looking good on satellite photos it'll be fine.
There was a crew at the house digging a trench for power from the pole to the shop. It's about 600' the way they went around the house. There will be a tombstone transformer about 100' from the shop and a meter on the shop. As part of the trenching they dug out the septic tank the new trench would be passing near so they'd know where the outlet pipe went. And they found that the outlet's got a hole rusted through and it's packed with ****. They cut out a section of pipe while I was there and it's packed through that section. They were going to try farther down and if they can, snake a camera into the leach field to check it. But it's probably bad. Which we had been expecting until the guy who pumped the tank told us it was good. Of course he meant the tank not the field.