I have been a lurker on here for some time. I believe I shared the 2.5 car garage I used to own in the past and have been drooling over everyone's shops here since. Anyway, I have since sold that house and found one that suits my families needs more. Anyway, I have been here for almost 2 years and its finally time to put my dreams on paper and begin the process. It took almost 2 years to get this property listed as agricultural. I have just over the minimum of 5 acres and now I can basically build whatever I want. I have been saving for this shop for some time and was just about ready, UNTIL my wife dropped this idea on me. All of this time I have been planning on this shop going out back. I liked the idea of some privacy, but more concerned with noise/smells and such. I planned on a 60x50x16 pole barn with a concrete pad and a new driveway from it, to the front, connecting to existing driveway. My wife and I were in our driveway the other day and out of nowhere she looks up at the house attached garage, then over the driveway pad and suggests just building a shop off the existing std 2 car garage. I looked up and the ideas started flowing again. This idea occurred to her as we are having the roof, siding, and windows done soon. She suggested we build/tie it in, then do the roof, siding, and windows together with the addition. Her only want is to match the front roof line across the building. Then I am thinking I can do less pitch/dormer from the peak to the rear for maximum height. 2 post lift is TOP of my list once the concrete is cured and need the overhead space as I will be working on my company vehicles and most have ladder racks and such. Obviously, I will be paying more on concrete/asphalt for the rear idea, plus grading, minor tree removal, but other than that, what are your thoughts?
Rear would be pole building, whereas front would be stick-built to tie into the house. The front area is already flat as its a driveway pad. The notch on front foundation is around the septic lids, then drain field goes back along inside fence line. I know I will have to remove the asphalt, re-grade, then re-pour, so costs MAY be similar, but not certain. Also, I know I should just call some contractors and get some quotes, but wanted to get some thoughts from the guys that may have had to make a similar decision as I continue to mull over this plan.
THANKS!

Rear would be pole building, whereas front would be stick-built to tie into the house. The front area is already flat as its a driveway pad. The notch on front foundation is around the septic lids, then drain field goes back along inside fence line. I know I will have to remove the asphalt, re-grade, then re-pour, so costs MAY be similar, but not certain. Also, I know I should just call some contractors and get some quotes, but wanted to get some thoughts from the guys that may have had to make a similar decision as I continue to mull over this plan.
THANKS!


