I am looking for help with a few questions and seems to me you guys here are the ones to ask. I have been looking through alot of other threads and sites everywhere possible on the internet with no solid answer to my questions.
Im on the interior of my shed 14x20 space. my questions are:
1. since i prefer not to mess with drywall i am doing corrugated tin all the way around the inside and need to know if i can get away with just using 1x4 nailers across the walls and ceiling to screw the tin to. or maybe even just to the studs with no backing at all between the tin and insulation. (trying to save money as well) *side note walls are 16"oc
2.how about using the corrugated furring strips?
3.should i start with the walls or ceiling first?
4.place baseboards first then tin on top or tin first then baseboards after?
I have seen the answer to #4 here before but it was an old thread so figured id ask it again.
Thanks for any and all help on the matter!!!

Im on the interior of my shed 14x20 space. my questions are:
1. since i prefer not to mess with drywall i am doing corrugated tin all the way around the inside and need to know if i can get away with just using 1x4 nailers across the walls and ceiling to screw the tin to. or maybe even just to the studs with no backing at all between the tin and insulation. (trying to save money as well) *side note walls are 16"oc
2.how about using the corrugated furring strips?
3.should i start with the walls or ceiling first?
4.place baseboards first then tin on top or tin first then baseboards after?
I have seen the answer to #4 here before but it was an old thread so figured id ask it again.
Thanks for any and all help on the matter!!!