



I completely understand...I have to do electrical which includes having a telephone pole moved and buried service$$$, garage doors, more concrete out front, insulation, interior finishing etc...the lift is way down the road. I have heard to only go with asymmetric lifts due to getting in and out of vehicles without dinging doors. I'm thinking 9-10k so I can put a 4door long bed 1ton cummins on it. It will be fun to watch your progress.
Sent from my iPhone using Tapatalk
I have about 40% of my inside lighting project completed so far. I designed it for 38 footcandles at the 2.5' plane.