I'm redoing my kitchen and it had vinyl over 1/4 plywood underpayment. I pulled it out and it has 3" tongue and groove pine over 1x6 plank subfloor.
It has some squeaky spots so I wanted to pull the 3" top floor and tighten the subfloor then go with 3/4 plywood as underlayment for vinyl or 3/4 hardwood as a top floor before I install the cabinets.
I have read about screwing the 3/4 underlayment to the joist and some saying not to the joist.
Any floor guys out there that can give me some advice?
It has some squeaky spots so I wanted to pull the 3" top floor and tighten the subfloor then go with 3/4 plywood as underlayment for vinyl or 3/4 hardwood as a top floor before I install the cabinets.
I have read about screwing the 3/4 underlayment to the joist and some saying not to the joist.
Any floor guys out there that can give me some advice?
