BoilermakerFan
Well-known member
Last night I put on the final coat of Danish Oil on the bottom/sides...
Tonight the legs and PSU were reinstalled.
Tomorrow my neighbor is helping me flip it over so I can wrap the sides in solid hickory, route the grooves for the heavy duty T-Track, and get the final coats of Danish Oil on it. Once it's in it's new home in my basement, I'll start planning the attached chest of drawers that will be attached to the bottom of the bench.
Behind my bench top is the little (2'x4') manually adjustable height work table I'm building for my mom. Her's just needs to be wrapped in solid maple and finish oiled.
Then I need to tackle my steel work bench in the background. Need to get it cleared off, mount my vise, and get it bolted to the floor.
Tonight the legs and PSU were reinstalled.
Tomorrow my neighbor is helping me flip it over so I can wrap the sides in solid hickory, route the grooves for the heavy duty T-Track, and get the final coats of Danish Oil on it. Once it's in it's new home in my basement, I'll start planning the attached chest of drawers that will be attached to the bottom of the bench.
Behind my bench top is the little (2'x4') manually adjustable height work table I'm building for my mom. Her's just needs to be wrapped in solid maple and finish oiled.
Then I need to tackle my steel work bench in the background. Need to get it cleared off, mount my vise, and get it bolted to the floor.
Last edited:











