For the experienced levelers out there.
I am expecting materials for my build to be delivered in the next 7-10 days but I need to get ready to start building before hand.
Shop 40x40 pole barn
Facing the front of the shop from left to right there is a 16-18" drop in the span of 40'.
How do I need to start?
I have 0 experience building a pole barn. I do have construction experience but I never had to do the leveling, it was always done by someone else.
I set a laser level up and measured around and to make sure I then pulled a string line to double check the laser since it was purchased used.
Help?! lol
I am expecting materials for my build to be delivered in the next 7-10 days but I need to get ready to start building before hand.
Shop 40x40 pole barn
Facing the front of the shop from left to right there is a 16-18" drop in the span of 40'.
How do I need to start?
I have 0 experience building a pole barn. I do have construction experience but I never had to do the leveling, it was always done by someone else.
I set a laser level up and measured around and to make sure I then pulled a string line to double check the laser since it was purchased used.
Help?! lol