I'm getting ready to have a pole barn built here in a couple weeks. I asked the contractor who is going to build it, what I needed to do to get the ground ready for him. He just said scrape the top soil back and get it fairly level. My lot is already pretty level, it only drops about a foot from one side to the other. I understand that if I take off about 6 inches off topsoil, they will hold the bottoms of the walls about 4 inches off the ground, which would put it close to ground level. But with the other side, if I take off 6 inches of topsoil and I'm a foot lower than the other side, will I need to bring some fill in to level the whole area up? Or can they just level the building, and I will level the inside with gravel once they are done. Wondered how others have done it and what works best. I'll probably call the contractor back and get more specifics from him, but thought I would ask here too.