Mine has been a major remodel of our lake house. The over all project has been done in phases and the main floor is all that is left. I gutted the kitchen, carpet, strange paper/fiber ceiling tiles, furing strips for said ceiling tiles, Trim, carpet, And electrical outlets/switches. I installed 16 can lights, moved or added electrical, and plumbing. We hung the drywall, but I had a local finisher to finish it out. We are 2 hours away and I wanted it done in a timely manner. New cabinets and countertops have been ordered as well as some new appliances. I finished the hardwood floors yesterday and put some outlasts back in. I will edit and add pictures as they get done. All in all a bunch of work, and up to this point has only taken about 1 month. If I could only have gotten cabinets sooner.