CountyCop911
Member
After reading a great deal of useful information on the Flooring Threads I have come to the conclusion I will be using VCT to finish the Floor in my 3-Car. I have a couple of questions and hope someone out here can provide some guidance.
First understanding the cleaner the better in all cases, just how much prep work would be recommended to prepare the surface for VCT application? I think the score lines would need to be sanded because there is a slight bevel on the edges and assume that would eventually manifest itself thru the tiles. Also would it be a good idea to fill the expansion joints with some sort of compound to still allow for expansion yet prevent the tile from possibly being depressed into the joints? If so what would make the most sense?
Lastly for finishing touches I would like to cover all exposed concrete which includes where the foundation is above the plane of the floor. See attached images. There are two situations, first is the scenario in which vertically the top of the foundation is behind the drywall yet can be seen. The amount of exposure varies because of the slope of the floor. The second is the area which is exposed parallel to the surface of the floor. I would like to finish both of these areas so as not to be able to see the concrete. I first considered using the same tile and simply continuing up whatever is exposed however the concrete is not smooth and likely would not take to tile very well. Thanks in advance for your help. This is a Great Board!!!
First understanding the cleaner the better in all cases, just how much prep work would be recommended to prepare the surface for VCT application? I think the score lines would need to be sanded because there is a slight bevel on the edges and assume that would eventually manifest itself thru the tiles. Also would it be a good idea to fill the expansion joints with some sort of compound to still allow for expansion yet prevent the tile from possibly being depressed into the joints? If so what would make the most sense?
Lastly for finishing touches I would like to cover all exposed concrete which includes where the foundation is above the plane of the floor. See attached images. There are two situations, first is the scenario in which vertically the top of the foundation is behind the drywall yet can be seen. The amount of exposure varies because of the slope of the floor. The second is the area which is exposed parallel to the surface of the floor. I would like to finish both of these areas so as not to be able to see the concrete. I first considered using the same tile and simply continuing up whatever is exposed however the concrete is not smooth and likely would not take to tile very well. Thanks in advance for your help. This is a Great Board!!!
