strutaeng
Well-known member
Hello guys, I'm starting on my foundation for this addition project. I need to dig for the grade beams. The grade varies slightly, but they need to be 12" below the natural grade. At the high side they will be like 6" above the grade and at the low side they will be like 12" above the grade. At some locations rock is very shallow (9-12"), so I will be digging to rock.
I'm forming the beams (2 sides) and then pouring the slab, not a monolithic pour. It's about 175 linear feet, so too much to do by hand.
What machine do I need? I have rented a 36" trencher before, but the width is only like 4" and the rental place said they don't make them with wider cutters. Mini-excavator with a 12" bucket? I don't know how to operate a mini excavator. Maybe sub- it out?
I'm forming the beams (2 sides) and then pouring the slab, not a monolithic pour. It's about 175 linear feet, so too much to do by hand.
What machine do I need? I have rented a 36" trencher before, but the width is only like 4" and the rental place said they don't make them with wider cutters. Mini-excavator with a 12" bucket? I don't know how to operate a mini excavator. Maybe sub- it out?