CampguyMark
Member
Hi Guys,
After spending the last couple of months reading and learning on this site, I'm finally ready to get to work on my garage floor.
As a background, I own a campground in the high desert of Southeast Oregon. About 20 months ago, I had my "Dream Garage/Shop" built, but just the shell. Since then, it's just been a very expensive storage unit.
The garage is 30' X 48' that is divided into two sections. The shop/workarea/Man cave is going to be 30' X 22' with 10' ceilings while the garage will be 30' X 26' with 12' celings and with large doors on both sides, so that we can drive thru the garage.
The worst part of the job was getting everything moved out of the shop side and stacked up on the garage side!
The next big hurdle is that we are in a very remote part of the country. The closest town, with any stores is 60 miles away and that's a town of 3,000 people. The closest Home Depot is 200 miles away. So, not only can we not hire anybody to help with the project, we were too far away from any tool rental store to rent the tools needed to prepare the project.
With that said, I decided to purchase the tools needed to grind the floors and finish the job myself. From my research on this site, I also decided to purchase all the epoxy products from Scotty and Legacy Industrial.
I ordered my tools, supplies and epoxy and waited for the UPS man to show up!
After spending the last couple of months reading and learning on this site, I'm finally ready to get to work on my garage floor.
As a background, I own a campground in the high desert of Southeast Oregon. About 20 months ago, I had my "Dream Garage/Shop" built, but just the shell. Since then, it's just been a very expensive storage unit.
The garage is 30' X 48' that is divided into two sections. The shop/workarea/Man cave is going to be 30' X 22' with 10' ceilings while the garage will be 30' X 26' with 12' celings and with large doors on both sides, so that we can drive thru the garage.
The worst part of the job was getting everything moved out of the shop side and stacked up on the garage side!
The next big hurdle is that we are in a very remote part of the country. The closest town, with any stores is 60 miles away and that's a town of 3,000 people. The closest Home Depot is 200 miles away. So, not only can we not hire anybody to help with the project, we were too far away from any tool rental store to rent the tools needed to prepare the project.
With that said, I decided to purchase the tools needed to grind the floors and finish the job myself. From my research on this site, I also decided to purchase all the epoxy products from Scotty and Legacy Industrial.
I ordered my tools, supplies and epoxy and waited for the UPS man to show up!


We were able to cut most of him out of the floor and after scraping his impression out, I'm sure the two coats of urethane will fill it in.