Hi! - I am new to GarageJournal - so trying to catch up with reading here. Will appreciate tips (on what to read) on how to re-pour a slab when next to the wall? And any other comments / questions..
Attached photo is my 3rd garage bay when new and where I plan to put the lift. From "the paper" seems to be 4" with 3k psi, which I plan to redo the slabs.
My main research at the moment will be that Left Post slab.. Trying to figure the specs on rebar style and gauge, deepness of the hole etc.. Thinking that because its so close to the wall.. I might not want to drill and anchor to it.. and instead use deeper "bent support" rebars that are "standalone". I really don't know at this point.. so trying to educate myself on options.. and should I consider epoxy anchors on the left?
Thanks!
Attached photo is my 3rd garage bay when new and where I plan to put the lift. From "the paper" seems to be 4" with 3k psi, which I plan to redo the slabs.
- The garage bay there has a working area of 20' deep x 12' wide x 10' height
- Planning to install lift 9'..10' deep, not sure wide yet..
- Lift Left Post needs to be against the wall (close to garage foundation)
- Most cars are 4-5k pounds
My main research at the moment will be that Left Post slab.. Trying to figure the specs on rebar style and gauge, deepness of the hole etc.. Thinking that because its so close to the wall.. I might not want to drill and anchor to it.. and instead use deeper "bent support" rebars that are "standalone". I really don't know at this point.. so trying to educate myself on options.. and should I consider epoxy anchors on the left?