akpolaris
Well-known member
I have an in progress shop build going on. Radiant heat in slab, 32' X 32' with 16' walls. 6" slab was poured 6 months ago. The building is very tight with very little air exchange happening. I had noticed condensation between the insulation and vapor barrier so decided to try a dehumidifier in an effort to eliminate this moisture. This dehumidifier is presently pulling about 1.5 gallons a water daily. How can I estimate how long this will be happening?