Sure you can do it!
You just need to make it into "components" that are able to be crained or forklifted for disassembly and re assembled.
You'll end up taking some metal off of the roof as I'd make it 3 sections and provide a flat "parking" space for each section. The wall metal will probably be mostly removed and you'll need some 16' spreaders for lifting all of the "components" or sections.
Rehearsing your sequence in your head over and over until you've considered all of the stresses, lifting points and load support (spreader bars) until your confidence and procedure will be 2nd nature. You'll still have surprises but hopefully little ones.
You'll need a very careful layout of your brackets in the new foundation as your posts are not movable. Make your post measurements from one end continually. Do NOT measure 96 5/8 to the first post, 94 1/2 to the next post, etc. You'll have "accumulated error". Triple check these numbers!!!
A Crain would be ideal and make for a much more "civilized" operation, plus you'll have a extra (and experienced) man on site. Money spent here will be well spent and possibly be a determining factor for your satisfactory results.
Keep in mind that the walls as built are for load carrying downward from loads above. Simply tying a 20' wall section to the spreader bar from the top plate (or whatever you have) without additional metal straps or bracing....
Do not think that the Crain will pull the posts out of the ground. This will require (probably) some excavation around the post, suspending the wall section and cutting them off (long) with a chainsaw or Sawzall. You'll trim all of these to the same length later.
It's a big job but a well laid out and understood plan will make this work.

This all is presuming that you have a fair bit of construction understanding and experience.