Today I finished up everything else else. Did some additional bracing. Moved a few hangers around. Tuck taped up the rest of the tyvek. And completed the sub fascias. Back to work Monday.
Too late, I didn't bother. No real wave that I can tell.
Just got a quote from the electrician. I think he is asking way too much money. I'm going to have to shop around. It is very tempting to just do it all myself without a permit.
Back to my real job tomorrow.
Personally I would snap a chalk line and even out the overhang. The fascia will have a wave in it otherwise
Too late, I didn't bother. No real wave that I can tell.
Just got a quote from the electrician. I think he is asking way too much money. I'm going to have to shop around. It is very tempting to just do it all myself without a permit.
Back to my real job tomorrow.