Looking good man! I really like the idea of having the reciever in the ground. Only other thing i would have done is put some vapor barrier in the slab to be sure the slab wont sweat.
Well, I decided on the receiver after thinking about things for a while. I live pretty close to a busy street, and it doesnt rest good with me when I have to leave a trailer or something out overnight, so I thought about just putting some U bolts in as anchors, then the receiver idea seemed like it could double as an anchor point, and as a mount for other tools and what not...
Here's a pic. I also welded some plates to its side vertically and horizontally to keep it from ever trying to pull out The tube itself was 12" long, so they actually dug a post hole for it....I meant to paint it before I put it in, but I'll just do it tomorrow...
Fiber mesh isnt a bad idea but I wouldnt solely trust it. I worked at a concrete plant for 5 yrs and we advertised this stuff as the latest and greatest but the contracters still would put steel in the crete. Hope it works out for ya though....
Well, the concrete guys said they have had good results with it (which I expect them to say that), but I also know a few people that have used it with no problems...
Looks good so far. Will you be putting a lift in there?
Yes, there will be a lift. I have already decided where to place it, and had the concrete guys dig 2 mount pads for it. The area where the lift will sit is probably a little over 6" deep...You can see where the lift will be in the sketch below, or at least the right column of it, just to the right of the Jeep..
I think I am going to also be purchasing a motorcycle lift, as I have a Harley and a few ATV's. I am also going to try to build some sort of rack to put one ATV on top of, and one underneath it. I need to start a separate thread about that though...
Here are a couple other pics of after the guys left...I probably wont have any more picture updates until the middle of next week or so. As the framers arent supposed to be here until at least Tuesday...
The electric company did come out today, and I am setting up seperate 200 amp service strictly for the shop. I have them set up to come out hopefully on the week on the 14th sometime, but we will see if that sticks. I was going to run 3 phase to the shop, but they were going to want too much to set it up. Dropping back to single phase also saved me $2000 on the electrical bid...
.