premierjax
Well-known member
Well guys after digging my holes yesterday I found that Im drilling right into the water table
After the first hole I noticed some seepage around the bottom by the time the guy was done digging all 14 of the holes had water in the bottom of them and 7 or 8 of the holes 3' down the side were caving in. So I went to bed aggravated just to wake up in a cold sweat at 2 a.m. with a frigin rain storm the size of Texas beating on my window. Needles to say if the bottom of the holes werent already caved in enought now the top of the holes are as well!! Here is the big question now what the f*&% do I do with a bunch of caved in, filled to the brim with water, 4'6" holes!! I searched around yesterday for some 24" sonotubes, and found them, they are nothing more than cardboard in a tube shape, I figured with a trash pump for the water and a good set of post hole diggers I can clean the holes out stick the tubes in and before the bottom fills to much with water set the poles and pour 15 or so bags of 80# concrete into the holes. Has anyone ever had this issue? or can anyone direct me in what I should do? Please, please, please, if you have any ideas Im open for suggestions, understandably there is a lot of money sitting on the ground with materials, so I need to make a decision one way or the other on what I should do. Thank you in advance for any replies. Im sorry I just tried to load pictures to no avail, will work on it tonight.
After the first hole I noticed some seepage around the bottom by the time the guy was done digging all 14 of the holes had water in the bottom of them and 7 or 8 of the holes 3' down the side were caving in. So I went to bed aggravated just to wake up in a cold sweat at 2 a.m. with a frigin rain storm the size of Texas beating on my window. Needles to say if the bottom of the holes werent already caved in enought now the top of the holes are as well!! Here is the big question now what the f*&% do I do with a bunch of caved in, filled to the brim with water, 4'6" holes!! I searched around yesterday for some 24" sonotubes, and found them, they are nothing more than cardboard in a tube shape, I figured with a trash pump for the water and a good set of post hole diggers I can clean the holes out stick the tubes in and before the bottom fills to much with water set the poles and pour 15 or so bags of 80# concrete into the holes. Has anyone ever had this issue? or can anyone direct me in what I should do? Please, please, please, if you have any ideas Im open for suggestions, understandably there is a lot of money sitting on the ground with materials, so I need to make a decision one way or the other on what I should do. Thank you in advance for any replies. Im sorry I just tried to load pictures to no avail, will work on it tonight.