Full Throttle
Well-known member
- Joined
- Nov 8, 2011
- Messages
- 285
I am new here, great forum lots of craftsmanship. I built a new house 2 years ago, and put up a 28'x36' versatube building for a shop. Afterfact I wish I would have done pole barn because metal is a pain in the
to work with. Any how I have to live it while I am building it. So far I have done 1/2 the walls, using 5 -1/4 deck board lagged horizontally from floor up to 8' on 2' centers then OSB ply. I built a full loft across the back 4'x28' and a a 2'x16'shelf down the other finished wall. I have 200amp service and plan on doing all exposed conduit after walls/ ceiling are done. I left the area open behind my walls and plan on blowing cavities with insulation. I am still undecided with roof insulation, I have too much stuff to work around now for foam spray, I just don't have a plan yet. I plan on using vinal/composite tile for floor in a 2'black white checker board with a 2'gray boarder. I have a 80k furnace and also plan on a Utube mounted on a 45 or a couple panel heaters as well. here are some pics
to work with. Any how I have to live it while I am building it. So far I have done 1/2 the walls, using 5 -1/4 deck board lagged horizontally from floor up to 8' on 2' centers then OSB ply. I built a full loft across the back 4'x28' and a a 2'x16'shelf down the other finished wall. I have 200amp service and plan on doing all exposed conduit after walls/ ceiling are done. I left the area open behind my walls and plan on blowing cavities with insulation. I am still undecided with roof insulation, I have too much stuff to work around now for foam spray, I just don't have a plan yet. I plan on using vinal/composite tile for floor in a 2'black white checker board with a 2'gray boarder. I have a 80k furnace and also plan on a Utube mounted on a 45 or a couple panel heaters as well. here are some pics