Hello everyone. I've been stalking and getting ideas from this forum for months now. I was able to start my dream garage in August of last year. Figured I would show my progress so far. Thanks for all the ideas. This pics are from the ground work. I needed over 40 triaxle loads of fill and stone brought in to bring it up to grade, back corner was over 6 1/2' low. These guys were in and out in 2 days and were pretty impressive on the machines. Only had 1 truck about tip over. Luckily a tree caught him. Pretty good considering they had to back up my driveway which is over 1300' with turns, trees and a steep hill.