Nice job. Can you post some pix of your tool setup, lighting, electric, air, etc in there? I always learn something by seeing how other guys set up their gear.
Well no pic's of all the tools so far. But its a 60 amp service that runs a blast cabinet,2 T-5 4 bulb lights, Got 4 20 amp receptible plugs every 5 feet all run in 3/4 conduit,2 welder plugs, 1 for my mig and 1 for my Tig. 60 Gal. IR 2 Stage Compressor. Band Saw,Plasma Cutter,Ect.
And before the code guys come out. Every thing has its own breaker and they only are turned on when in use. I dont run eveything at the same time.
I ran all this eqipment in the adjasint shed 12x16 before I built this shop on this same power without any issues.
It all works just fine. Is it the right way to do it. "Hell No". But if you are real careful you can make do with it.
Everything is run off of a 100 amp Main 20 circuit box. With the 100 amp being the main. Code here will allow the 100 amp main as a disconect for my 60 amps coming in.
When I have the house updated to 200 amps I will run 100 out to the shop.