Update 08-11-2013...First the concrete work out the front of the house to the road where the mail box will be.
Side walk across the ditch, all exposed culverts have to have concrete side treatment (HOA rules)
Two series of steps from the steep grade from the house to the road.
The front door...8-1/2 foot tall
Now for the concrete drive.
View from street straight on.
Looking at the attached garage.
looking at the work shop.
View half way down the drive.
View of the shop from the other side of the patio.
The shop looking from the attached garage.
The attached garage looking from the shop.
Now the most important part of the shop...toliet and wash sink. Builder still needs to install the door.
View of rear patio from the shop.
The kitchen.
View of kitchen from the family room, paper on the floor is covering the wood floor.
View of family room from study, notice our high dollar furniture.
And at last the next important room the study.
Walk thru will be next Friday and probably close at the end of the month.