My material was delivered on Wednesday, November 8, 2006. The crew was supposed to start but rain hampered them even coming onsite. My new start date was to be Friday the 10th.
The crew called me on Thursday, the site where they were scheduled to be working was too wet. They started at approxiamately 10 AM and waited until 11:30 AM for the inspector. The crew of 4 left the first day at 4:00 PM.
Friday morning at 8:30 AM 2 of the guys from the previous day showed up to finish the building. At 2:00 PM, they left and were done.
Concrete should be done in the next week or so, until then I will piddle with shutters, painting the door (yes, she is making me), I may even take the garage doors back down and paint them (hoping she doesn't make me do that), mounting the meter can and perhaps the garage door openers.
I was amazed at how much these guys got done and how fast it was done. I have been over the building, the only thing wrong I have found is my cupola was not delivered (once again, she made me do it). In the next week before the inspector from Pioneer comes out, I will thoroughly go over the building several times. The building was done by Pioneer Pole Buildings out of Pennsylvania.
Below is a link where I will be posting all of my pictures. I will post more when I do more work to the building. Thanks for taking a look.
Click here to see my garage images.
The crew called me on Thursday, the site where they were scheduled to be working was too wet. They started at approxiamately 10 AM and waited until 11:30 AM for the inspector. The crew of 4 left the first day at 4:00 PM.
Friday morning at 8:30 AM 2 of the guys from the previous day showed up to finish the building. At 2:00 PM, they left and were done.
Concrete should be done in the next week or so, until then I will piddle with shutters, painting the door (yes, she is making me), I may even take the garage doors back down and paint them (hoping she doesn't make me do that), mounting the meter can and perhaps the garage door openers.
I was amazed at how much these guys got done and how fast it was done. I have been over the building, the only thing wrong I have found is my cupola was not delivered (once again, she made me do it). In the next week before the inspector from Pioneer comes out, I will thoroughly go over the building several times. The building was done by Pioneer Pole Buildings out of Pennsylvania.
Below is a link where I will be posting all of my pictures. I will post more when I do more work to the building. Thanks for taking a look.
Click here to see my garage images.