Sat pm my father in law and I got a little insulation up and two more wall panels. (no pics)
Sunday am I finished tying in a couple of 220V lines to the panel box, installed the fan speed controller, and the connected the last switch for the bench lights (which is what the romex hanging out of the wall between the windows is for), and got the panel box trim all back on etc.
Then I took yesterday off. Did a little yard work, then spent about 3 hours finishing up the south wall insulation.
Late last night I went back out and hung basically all of the south wall upper metal panels. I just have one partial panel to do in the corner which requires I hang one sheet on the back wall first.
PEX feed through for the outdoor pool shower. Its almost like I planned that perfect. Because I did.
And then, because there is no sleep til Brooklyn, I put up a few of the lower panels.
More wed night.
Dan
Sunday am I finished tying in a couple of 220V lines to the panel box, installed the fan speed controller, and the connected the last switch for the bench lights (which is what the romex hanging out of the wall between the windows is for), and got the panel box trim all back on etc.
Then I took yesterday off. Did a little yard work, then spent about 3 hours finishing up the south wall insulation.
Late last night I went back out and hung basically all of the south wall upper metal panels. I just have one partial panel to do in the corner which requires I hang one sheet on the back wall first.
PEX feed through for the outdoor pool shower. Its almost like I planned that perfect. Because I did.
And then, because there is no sleep til Brooklyn, I put up a few of the lower panels.
More wed night.
Dan