turbosl2
Well-known member
Here is how its coming so far, one bay at a time. I have not stripped it and waxed it yet. I am just waiting on the self leveling filler to dry so i can razor it off level and finish the last bay.
I am amazed at how fast this stuff goes down. I can trowel out a 12x25' area in 20mins, and lay all the time in about 30mins, but the real time consumer is the edges. I have a VCT cutter, looks like a paper cutter, but still, it takes a long time to go around things.
I am amazed at how fast this stuff goes down. I can trowel out a 12x25' area in 20mins, and lay all the time in about 30mins, but the real time consumer is the edges. I have a VCT cutter, looks like a paper cutter, but still, it takes a long time to go around things.
