Old panel = Neutrals at the bottom
New panel = Neutrals at the sides
They won’t reach.
So, a bunch of wire nuts? Run new wire throughout the building?
How about an insulated bus bar? Land the preexisting neutrals to the bus bar, then run new wire from the bus bar and land it to where it needs to go. We are talking about 12 total. So 12 wires total going to the insulated bus bar, then 12 more going to the neutral bar. Sounds like a good alternative to wire nuts.
Hots all reach.
Some grounds will reach, others won’t.
New panel = Neutrals at the sides
They won’t reach.
So, a bunch of wire nuts? Run new wire throughout the building?
How about an insulated bus bar? Land the preexisting neutrals to the bus bar, then run new wire from the bus bar and land it to where it needs to go. We are talking about 12 total. So 12 wires total going to the insulated bus bar, then 12 more going to the neutral bar. Sounds like a good alternative to wire nuts.
Hots all reach.
Some grounds will reach, others won’t.

