bearskinner
Well-known member
Too many projects, not enough time. As much as I want to do radiant floor heating in my new shop, I will be done with work forever in 3 weeks, so I only have time to build a 22x40 motorhome cover, run the electrical, and back load the pea gravel before the snow fly's. I still need to clear the trees, level the ground, and trench for services. It's killing me as I had planned out all the winter projects to do. The wife keeps telling me to slow down, make it all FUN retirement projects............it is fun, when its all done! gonna be hard to learn to relax a little
