never enough time, building priority's

bearskinner

Well-known member
Joined
Aug 23, 2014
Messages
61
Location
N. Idaho
Too many projects, not enough time. As much as I want to do radiant floor heating in my new shop, I will be done with work forever in 3 weeks, so I only have time to build a 22x40 motorhome cover, run the electrical, and back load the pea gravel before the snow fly's. I still need to clear the trees, level the ground, and trench for services. It's killing me as I had planned out all the winter projects to do. The wife keeps telling me to slow down, make it all FUN retirement projects............it is fun, when its all done! gonna be hard to learn to relax a little
 
To avoid these ads, REGISTER NOW!

jwhcars

Well-known member
Joined
Nov 18, 2007
Messages
756
Location
Central PA
You will regret not putting in the radiant floor heat. I would hire a helper or two and get it done.
It won't hurt for the motor home to sit outside for the winter.
 
To avoid these ads, REGISTER NOW!

kbs2244

Well-known member
Joined
Nov 11, 2006
Messages
14,065
Explore the possibilty of overhead I R radient heat instead of in the floor.
It is less complex and thus should be less cost.
 
OP
B

bearskinner

Well-known member
Joined
Aug 23, 2014
Messages
61
Location
N. Idaho
Ill still get the radiant floor done but not till next year. I need to get the second shop built to keep the motorhome, trailer, and tractor under cover. lots of projects, and never enough time. I do like the idea of just going fishing tho........
 