hidollartoys
Well-known member
I am in the planning stages of a new shop. The building will be all steel with a "vaulted" ceiling. Construction is "truss joists" on approx 12 centers with steel purlins and girts on 2ft centers. Prior to installing the skin, the entire building will be wrapped in a R-13 fiberglass blanket with radiant barrier on the outside against the skin and white vinyl on the inside. A radiant floor system is planned. Slab will be 6". The building will be located on the southern edge of Kansas City metro.
I need some help with the heat load calc and design. Seems like most of the floor systems on here are located farther north where the heating requirements are significantly greater than required in this geo area.
I need some help with the heat load calc and design. Seems like most of the floor systems on here are located farther north where the heating requirements are significantly greater than required in this geo area.