Hit-By-Thunder
Well-known member
hey Carl, your getting alot done. I have to laugh about your comment that things are going slowly forward. I hear ya, we are on the melting side too, 4-6 degrees C for daytime high. I managed to get the sanding of the second coat of drywall compound done. hopefully prime and paint this weekend.
I also noticed in one of your pictures how much stuff accumulates inside the garage as you work on it. I bought castors and built 2 4x8 rolling platforms works perfect. I too have the same thing happening with my stuff in the garage.
You mentioned you will be wiring the garage to the house in the spring, funny,...... me too. Have to wait til the ground thaws out
Great updates all the same. slow and steady wins the race.
Rob/HBT
I also noticed in one of your pictures how much stuff accumulates inside the garage as you work on it. I bought castors and built 2 4x8 rolling platforms works perfect. I too have the same thing happening with my stuff in the garage.
You mentioned you will be wiring the garage to the house in the spring, funny,...... me too. Have to wait til the ground thaws out
Great updates all the same. slow and steady wins the race.
Rob/HBT
