Hi, I am new to this forum and could use some guidance. I (via a contractor) am building a detached 24 x 24 detached garage. The garage slab was poured about 10 days ago. The slab and the footings were poured at the same time. I watered the slab regularly once it was sufficiently hard for the first 7 days. When I started watering I noticed 6 or 7 low spots where the water pooled. These low spots are between 1/4 and 1/2 inch deep. The contractor says no problem.
I poured my own 20x30 garage floor in the 70s with father and I know we got it more level than that. Is this a big problem? I don’t want to do a leveling overlay but I will epoxy the floor in about 6 weeks. Thanks for the advice. Jim