This spring I will be installing a new electric service and a well at a farm I purchased. I would like to get a 400 amp service run to an independent riser. From that I would like to feed a separate barn with a 200 amp load center and have the capability of feeding a future house with a 200 amp load center.
Do I need a a 400 amp combination meter base? Recommendations?
Also, I'd like for the meter base to have some slots for circuits.
Sent from my iPad using Tapatalk
Do I need a a 400 amp combination meter base? Recommendations?
Also, I'd like for the meter base to have some slots for circuits.