There was a piece displaced when they dumped the fill. We managed to get it mostly back in place. It didn't bother me much because it's back filled on both sides there. The tall, open walls were much more important, and those are ok. Under-slab insulation will be done by me as soon as the fill is done. Hopefully early this week. There will be a vapor barrier go down first, then 2" Foamular 250 insulation.