Hey guys this is my first post. I been reading topics here for a while. But I never had any comments of any value.
My Delma is I'm currently building a new house and my attached garage is 23'x47' with 13.5' ceilings.
I'm planing on installing a 2 post lift in the future so I want to have my cement preped
and ready for that.
I'm considering a Mohawk lift for my 1ton truck. And was thinking on putting it about 14' from the garage door and I wanted the two locations in the cement to be about 3'x3' and a extra 4" deep to add to the thickness.
In the picture where the 2x4 piece of wood is it's at the 14' location.
My Delma is I'm currently building a new house and my attached garage is 23'x47' with 13.5' ceilings.
I'm planing on installing a 2 post lift in the future so I want to have my cement preped
I'm considering a Mohawk lift for my 1ton truck. And was thinking on putting it about 14' from the garage door and I wanted the two locations in the cement to be about 3'x3' and a extra 4" deep to add to the thickness.
In the picture where the 2x4 piece of wood is it's at the 14' location.
Last edited: