thomn8r
Member
Just found this site!
Here's my garage/shop.
http://www.rennlight.com/shop/
Highlights: 25x25, bathroom, scissor lift set into floor, air, lots of light, lots of electrical (110v & 220v), A/C, positive ventilation, stainless-covered workbenches, copper-plated welding bench, computer w/wireless newworking, fridge. Plan to add a vacuum later.
Cost me ~$20k - $25k, doing a lot of the work myself.
Here's my garage/shop.
http://www.rennlight.com/shop/
Highlights: 25x25, bathroom, scissor lift set into floor, air, lots of light, lots of electrical (110v & 220v), A/C, positive ventilation, stainless-covered workbenches, copper-plated welding bench, computer w/wireless newworking, fridge. Plan to add a vacuum later.
Cost me ~$20k - $25k, doing a lot of the work myself.
