Last weekend I spent most of my time doing exterior landscaping. I cut a drainage trench around the South and East side of the building. Since we got more rain and now some snow I think I am done with that project until next summer. The electrican did arrive on Monday, so now we have lights.
The building contractor came back to the job site and finished insulation and sheeting the interior walls of the South section. The common wall between the North and South sections will have pine boards. They should go in next week.