Hi G.J Crew, I have been lurking sine 07-30-2014. I love all your ideas and expertise you share.
Im Currently having a building built as we speak. They should be done this week.
The details are, 80' wide, 64' deep and 16' with a 8' leanto for my firewood.
I will be using half the the barn for my shop / man cave.
So that will be 40' x 64.
I will be doing infloor radiant heat, and be putting in a two post shop lift (10k).
Im currently researching info on infloor heat, vapor bearer, foam, insulation, supporting pipes and boiler, Lights, fans, air conditioner, electrical, air compressor line setup, and erosion control.
I hired an excavator for the pad work and he hauled in 73 dump truck loads.
The pad is 10' wider then the building, and its just over 6' tall in the back left corner.
Im Currently having a building built as we speak. They should be done this week.
The details are, 80' wide, 64' deep and 16' with a 8' leanto for my firewood.
I will be using half the the barn for my shop / man cave.
So that will be 40' x 64.
I will be doing infloor radiant heat, and be putting in a two post shop lift (10k).
Im currently researching info on infloor heat, vapor bearer, foam, insulation, supporting pipes and boiler, Lights, fans, air conditioner, electrical, air compressor line setup, and erosion control.
I hired an excavator for the pad work and he hauled in 73 dump truck loads.
The pad is 10' wider then the building, and its just over 6' tall in the back left corner.