ncboat
Well-known member
Thanks to those of you who have educated many of us. Slab for new shop is formed 34x36 and I am going to put 2" schedule 80 in the footer. Is that to big for 2x4 walI? have to run roughly 55ft from the main panel to the footer access. I cant find 2224 urd by the foot but Lowes has 2224 use (I think) by the foot. Can I use the 2224 USE if it is in conduit all the way to the subpanel?
As an aside I am having the concrete guy put in a ufer. I didnt know anything about it till you all enlightened me. The concrete guy has never done one so I asked the electrical inspector about it when I applied for my permit. He chuckles and says the concrete guys don't want any more inspections that slow down pouring.
Separate question. I can pick up wire this weekend 10% off. I was thinking of picking up a 1000ft spool of 12/2 and just using it for all my 120v circuits. Do you think I would use most of it?
As an aside I am having the concrete guy put in a ufer. I didnt know anything about it till you all enlightened me. The concrete guy has never done one so I asked the electrical inspector about it when I applied for my permit. He chuckles and says the concrete guys don't want any more inspections that slow down pouring.
Separate question. I can pick up wire this weekend 10% off. I was thinking of picking up a 1000ft spool of 12/2 and just using it for all my 120v circuits. Do you think I would use most of it?