sweetk30
Well-known member
Building a new work trailer for driveway sealing .
2 6k torsion axles. 5 225/90/16 14ply trailer tires . Frame is 5x3x3/16 rectangle tube .
Doing a 16ft trailer deck . Last 4 foot will be a platform for tar buggy and blower . It will hinge down like a ramp and then up to flat for road transport.
Whole deck will be expanded metal . Have a few more cross members to add and make the tounge.
2 6k torsion axles. 5 225/90/16 14ply trailer tires . Frame is 5x3x3/16 rectangle tube .
Doing a 16ft trailer deck . Last 4 foot will be a platform for tar buggy and blower . It will hinge down like a ramp and then up to flat for road transport.
Whole deck will be expanded metal . Have a few more cross members to add and make the tounge.
