haywirefarm
Member
Hey y'all! I've read a lot of good information on here and looking forward to continuing to learn. I've got my slab poured (long story there) for a tube metal building that should go up in a few weeks. It's a 30x50x12 with a 10x50 lean-to. I opted for the double bubble insulation. Hoping to put in at least a 10k lift.
